Buying in Brazil · off-plan
Buying off-plan in Brazil as a foreigner
Sources checked on October 31, 2026 · Antológica, buyer's agent in Curitiba (CRECI/PR J11051)
Short answer
Brazilian law protects off-plan buyers in four ways: the developer can only sell after registering the development at the property registry; the project can be legally segregated from the developer's other debts; delivery can be at most 180 days late before you can cancel with a full refund; and if you cancel, the developer keeps at most 25% of what you paid (50% in segregated projects).
General information on Brazilian law, not legal advice for your case. Every contract is read before signing.
What to check before you sign
- The registration of the development plan (memorial de incorporação) at the property registry. The developer can only sell units after it (Law 4,591/1964, art. 32), and the registration number and registry office must appear in the ads, proposals and contract (art. 32, § 3).
- The summary table at the start of the contract (quadro-resumo): price and payment terms, the index that corrects the installments, the consequences of cancelling, the right of withdrawal, the registration number and the deadline for the occupancy permit (habite-se) (art. 35-A).
- Whether the project is under the segregated-assets regime (patrimônio de afetação), which you can see on the land's registration record (matrícula).
Patrimônio de afetação: the project protected from the developer's debts
Under the segregated-assets regime, the land and the construction are separated from the developer's other assets and only answer for the debts of that project (Law 4,591/1964, art. 31-A, § 1). If the developer goes bankrupt, the segregated project is not part of the bankruptcy (art. 31-F).
The regime is optional: the developer decides (art. 31-A). It exists from the moment it is recorded on the land's registration (art. 31-B), so ask for the updated matrícula before signing.
Price correction during construction (INCC)
Installments paid during construction are usually corrected by the INCC, a construction cost index published by FGV. No law requires the INCC: the contract must state which index applies (art. 35-A), and Law 10,931/2004 (art. 46) allows monthly correction by a sector or general index in contracts of 36 months or more.
For reference, the INCC-M rose 0.35% in October 2026 and 6.75% in the previous 12 months (FGV IBRE, released October 27, 2026).
If the delivery is late
- A delay of up to 180 calendar days after the contract date does not allow cancellation or a penalty, if that tolerance is clearly stated in the contract (Law 4,591/1964, art. 43-A).
- After 180 days, a buyer who is up to date can cancel and get back everything paid plus the contractual penalty, corrected, within 60 days (art. 43-A, § 1).
- Or wait for the delivery and receive 1% of the amount paid for each month of delay beyond the 180 days; it cannot be combined with the cancellation penalty (art. 43-A, §§ 2 and 3).
If you want to cancel (distrato)
| Project with patrimônio de afetação | Project without it | |
|---|---|---|
| Maximum the developer keeps | 50% of what you paid | 25% of what you paid |
| When the refund is paid | Within 30 days after the occupancy permit | In a single payment 180 days after the cancellation (or 30 days after the unit is resold) |
Law 4,591/1964, art. 67-A, §§ 5 to 7. The brokerage commission is also deducted (art. 67-A, I).
Right of withdrawal: a contract signed at a sales stand or outside the developer's office can be undone within 7 days with a full refund, including the commission. The proof is a registered letter with acknowledgment of receipt (art. 67-A, §§ 10 to 12).
At delivery: occupancy permit, registration and ITBI
- After the occupancy permit (habite-se), the developer must record the construction on the registration, and answers for losses if it delays (Law 4,591/1964, art. 44).
- Each unit can have its own registration record (matrícula) from the registration of the development; until the construction is recorded, acts are made on the original record and repeated on the units' records (Law 6,015/1973, art. 237-A).
- In Curitiba, the property transfer tax (ITBI) is 2.7% of the price in the deed or financing contract, unless that is below the city's reference value (Complementary Law 108/2017). When it falls due on an off-plan purchase depends on how the transfer is formalized; we check it for each contract.
Off-plan and under construction in Curitiba
Developments in our catalogue that are in pre-launch, launch or under construction, with the expected delivery date:
94 developments in our Curitiba catalogue are not delivered yet, from 51 developers. The next deliveries:
AhúLior2–3 bedrooms · 72–161 m²Under construction · delivery Nov 2026From R$ 1.21 million≈ US$ 219,000
BigorrilhoMytá3 bedrooms · 147–246 m²Under construction · delivery Nov 2026From R$ 3 million≈ US$ 544,000
Cristo ReiFlag3 bedrooms · 130–182 m²Off-plan · delivery Nov 2026From R$ 1.77 million≈ US$ 322,000
BigorrilhoBoutiq2–3 bedrooms · 111–222 m²Under construction · delivery Nov 2026From R$ 2.04 million≈ US$ 370,000
Frequently asked questions
Is it safe to buy off-plan in Brazil?
It is regulated: the developer can only sell after registering the development (Law 4,591/1964, art. 32), late delivery beyond 180 days lets you cancel with a full refund, and the segregated-assets regime protects the project from the developer's other debts. The risk depends on the developer and the contract, which should be read before signing.
What happens if the developer goes bankrupt?
If the project is under the patrimônio de afetação regime, the bankruptcy does not reach it (art. 31-F): the land and the construction stay tied to that project. Without the regime, that legal protection does not exist. Check the regime on the land's registration before signing.
Can I cancel an off-plan purchase in Brazil?
Yes. The developer can keep the brokerage commission and up to 25% of what you paid, or up to 50% in projects under the segregated-assets regime (art. 67-A). If you signed at a sales stand or outside the developer's office, you can withdraw within 7 days with a full refund.
What if my apartment is delivered late?
Up to 180 days of delay are tolerated if the contract says so. After that you can cancel and get everything back plus the contractual penalty within 60 days, or wait and receive 1% of the amount paid per month of delay (art. 43-A).
What is the INCC?
A construction cost index published by FGV, commonly used to correct installments during construction. It is a contract choice, not a legal requirement. The INCC-M rose 6.75% in the 12 months to October 2026.
Questions about your case? We answer in English, and you pay us nothing: the developer or the seller pays the commission.
Prefer email or a video call? Send us a message
Official sources
Each rule above was checked against these primary sources on the date at the top of the page.
